For three years, many California homeowners waited to see whether the courts would bring back the old net metering rules. That wait is over. In June 2026, the California Supreme Court declined to review the case, and NEM 3.0 is now the settled rule for new solar customers of PG&E, SCE, and SDG&E.
The big change is simple. Power you use from your own panels is worth the full retail rate. Power you export to the grid earns only a few cents per kWh. This guide shows the 2026 export rates, a worked example of what solar and a battery save, and what to ask before you sign a quote. Last reviewed on October 10, 2026.
Quick answer: what is NEM 3.0 in 2026?
- Official name: the Net Billing Tariff. It applies to new solar interconnection applications at PG&E, SCE, and SDG&E since April 15, 2023.
- Legal status: final. The California Supreme Court declined to review the case on June 10, 2026.
- Export credit: about 3.7 to 4.6 cents per kWh on average for 2025 and 2026 applicants, and it changes by hour and season.
- Rate lock: your export prices are fixed for 9 years based on the year you apply.
- Battery: not required, but it changes the savings because it moves midday solar into the expensive evening hours.
- Existing NEM 1.0 and 2.0 customers: keep their terms for 20 years from interconnection.
NEM 3.0 at a Glance
| Question | Answer |
|---|---|
| Official name | Net Billing Tariff, commonly called NEM 3.0 |
| Who it applies to | New solar customers of PG&E, SCE and SDG&E with applications on or after April 15, 2023 |
| Who it does not apply to | LADWP, SMUD and other municipal utilities |
| How exports are paid | Hourly avoided-cost values that change by season, weekday and weekend |
| Average export credit | About 3.9 cents (PG&E), 4.6 cents (SCE) and 3.7 cents (SDG&E) per kWh for 2025 and 2026 applicants |
| Rate lock | 9 years, based on the year you apply |
| Battery required | No |
| Legacy NEM 1.0 and 2.0 | Keep their terms for 20 years from interconnection |
| Legal status | Final after the Supreme Court declined review on June 10, 2026 |
Is NEM 3.0 Final?
Yes, as far as the courts are concerned. Reporting from PV Magazine USA confirms that the California Supreme Court declined to hear the appeal on June 10, 2026, which leaves the March 2026 appeals court decision in place.
| Date | What happened |
|---|---|
| December 2022 | The CPUC adopts the Net Billing Tariff |
| April 15, 2023 | NEM 3.0 applies to new interconnection applications |
| August 2025 | The California Supreme Court sends the case back to the appeals court for another review |
| March 2026 | The Court of Appeal upholds NEM 3.0 again |
| June 10, 2026 | The California Supreme Court declines to review the case |
Any future change would have to come from the California Public Utilities Commission (CPUC) or the Legislature. For the official rules, see the CPUC net billing page.
NEM 3.0 Export Rates in 2026
There is no single export rate. Credits come from the CPUC’s Avoided Cost Calculator and vary by hour, month, and weekday. A kWh exported at noon is worth far less than one exported at 7 pm. The averages below are for customers who applied in 2025 or 2026, as summarized by NRG Clean Power from the 2024 calculator update.
| Utility | Average export credit | Required rate plan (as reported) | Export adder for 2026 applicants |
|---|---|---|---|
| PG&E | About 3.9 cents per kWh | E-ELEC | Small adder, locked in for 9 years |
| SCE | About 4.6 cents per kWh | TOU-D-PRIME | Small adder, locked 9 years |
| SDG&E | About 3.7 cents per kWh | EV-TOU-5 | None |
The export adder (called ACC Plus, or the Energy Export Bonus Credit at PG&E) is reported at roughly 1 to 2 cents per kWh for 2026 applicants, with higher values for CARE and FERA households. Ask your installer for the current value and check your utility’s published schedule, such as the SCE export pricing page or the PG&E Solar Billing Plan page.
How the 9-year lock works
- Your application year sets your prices. Each utility publishes a set of hourly export prices for that year.
- The prices stay for 9 years. After that, exports are paid at whatever the current calculator says.
- A new set is expected for 2027 applicants. No one can say yet whether it will be higher or lower.
What Solar and a Battery Actually Save Under NEM 3.0
The simplest way to see the effect is a worked example. The numbers below are an illustration, not a quote. They use reported average residential rates, and real time-of-use rates will differ.
Assumptions
- System output: 10,000 kWh per year.
- Solar only: half is used at home (5,000 kWh), and half is exported (5,000 kWh).
- With a battery: 3,000 kWh of exports are stored and used in the evening, with 90% round-trip efficiency, so 2,700 kWh offset grid purchases.
- SCE: average retail rate of 35.3 cents per kWh and export credit of 4.6 cents.
- PG&E: average retail rate of 39.25 cents per kWh and export credit of 3.9 cents.
| Scenario | SCE example | PG&E example |
|---|---|---|
| Solar only, yearly bill savings | $1,995 | $2,158 |
| Solar plus battery, yearly bill savings | $2,810 | $3,100 |
| Added by the battery | $815 per year | $943 per year |
Why evening rates change the result
Average rates understate the battery’s value on time-of-use plans, because peak evening prices are higher than the average. The table repeats the SCE example with different evening rates.
| Evening rate you avoid | Battery adds per year (SCE example) |
|---|---|
| 35.3 cents (reported average) | $815 |
| 45 cents | $1,077 |
| 55 cents | $1,347 |
What this example leaves out
- Battery cost. To estimate payback, divide the net battery cost by the added yearly savings, then add the solar side.
- Backup power. Outage protection has value that does not show up on your bill.
- The fixed charge. It applies whether or not you have solar (see below).
- Your own usage. Your load profile decides how much solar you use directly.
For battery models, warranties, and sizing, read our Qcells battery storage guide. For price ranges, see how much solar panels cost in 2026.
How to Design a Solar System for NEM 3.0
- Size for your use, not for exports. Oversizing mostly adds low-value exports.
- Ask for your load profile. A 24-hour view of when you use power shows how much solar you can use directly.
- Shift flexible loads to daylight. Run laundry, dishwashers, pool pumps, and EV charging when your panels are producing.
- Program the battery for your peak window. Most systems let you set evening discharge in the app.
- Request your utility’s hourly export schedule. Make sure the savings estimate uses the right export year.
The New Fixed Charge (Base Services Charge)
California’s big utilities now bill a flat monthly charge that solar cannot remove. It sets a floor under your bill, so your savings come from the usage portion only. The amounts below come from the CPUC decision as described in PG&E’s filing with the commission.
| Household type | Monthly charge | About per year |
|---|---|---|
| CARE customers | $6.00 | $72 |
| FERA customers | $12.08 | $145 |
| All other customers | $24.15 | $290 |
- SDG&E: began in October 2025.
- SCE: began in November 2025.
- PG&E: began March 1, 2026. See the PG&E Base Services Charge page.
Utilities That Are Not on NEM 3.0
NEM 3.0 covers only PG&E, SCE, and SDG&E. Municipal utilities such as LADWP and SMUD, and other city utilities, set their own solar billing rules. Some still credit exports at or near the retail rate, so the math can look very different.
- Check your bill. Your utility name decides which rules apply, not your city.
- Ask for utility-specific numbers. Do not use NEM 3.0 estimates for a municipal utility address.
If You Already Have NEM 1.0 or NEM 2.0
| Question | What was reported |
|---|---|
| How long do legacy terms last? | 20 years from the original interconnection date |
| Who qualified for NEM 2.0? | Customers whose qualifying application was submitted by April 14, 2023 |
| Can I expand my system? | Generally by the greater of 1 kW or 10% of the original size, with a revised application |
| Can I add a battery? | Generally yes without losing legacy status, but follow your utility’s current rules |
| What if I sell my home? | Terms stay with the system. A 2025 proposal to end them at sale was removed in committee, per reporting. Confirm the remaining years with your utility. |
If your legacy term ends soon, adding a battery before the switch can protect your savings. Check the details with your utility, such as the SDG&E net energy metering page.
Incentives After the Federal Credit
| Incentive | Status in 2026 | What to do |
|---|---|---|
| Federal residential credit | Ended for expenses after December 31, 2025 | Do not count on a 30% credit for a 2026 purchase |
| SGIP battery rebate | General residential funding reported closed or waitlisted in 2026, with equity categories varying | Do not count it in your savings until a reservation is confirmed in writing |
| Property tax exclusion for new solar | Applies to systems completed before January 1, 2027, with a more limited rule described for later dates | Ask your installer and county assessor how your completion date is treated |
The Board of Equalization explains the current deadline in its active solar energy system guidance. Rules can change, so confirm them before you rely on them.
Questions to Ask Before You Sign a NEM 3.0 Quote
- Which export year does your estimate use? Your lock-in year affects your prices for 9 years.
- What is my modeled self-use? Ask what share of production you will use directly.
- Which rate plan will I be on? Confirm the required plan and your evening rates.
- Does the estimate include the fixed charge? It should not be treated as removable.
- How was the battery sized? Ask for the load profile behind it.
- Which incentives are assumed? Get SGIP and other programs in writing and treat unconfirmed ones as zero.
Our guide on how to read a solar quote shows where each of these items should appear.
For the broader question of whether the investment pays off for you, read: Are solar panels still worth it in 2026?
Get a California Solar and Battery Estimate From Qcells Direct
Qcells Direct connects California homeowners to factory-direct Qcells solar panels and battery storage, installed by certified local teams. Learn more on our Qcells solar panels in California page, or compare ways to pay in cash vs. financing for solar panels.
Request your free California solar and battery estimate and ask us to model your usage under your utility’s NEM 3.0 export rates.
NEM 3.0 FAQ
Is NEM 3.0 final in 2026?
Yes. The California Supreme Court declined to review the case on June 10, 2026, which leaves the March 2026 appeals court decision in place. Any future change would have to come from the CPUC or the Legislature.
How much does NEM 3.0 pay for exported solar?
For 2025 and 2026 applicants, average export credits are about 3.9 cents per kWh on PG&E, 4.6 cents on SCE, and 3.7 cents on SDG&E. Credits vary by hour and season, and evening values can be much higher than midday values.
Do I need a battery with NEM 3.0?
No, a battery is not required to interconnect. Financially, it often helps, because it lets you use midday solar in the evening instead of exporting it for a few cents and buying power back at a much higher rate.
What does a solar and battery system actually save under NEM 3.0?
It depends on your usage, rate plan, and system size. In the worked example above, a battery that shifts 3,000 kWh into the evening adds about $815 per year on SCE and about $943 per year on PG&E at average rates, and more when your evening rates are higher.
How long are NEM 3.0 export rates locked in?
Nine years. Your export prices are set by the year you apply, and a new set is expected for 2027 applicants.
What is the difference between NEM 2.0 and NEM 3.0?
NEM 2.0 credits exports close to the retail rate. NEM 3.0 credits exports using the Avoided Cost Calculator, a lower value that changes by hour and season. That shifts the savings toward self-use and batteries.
Does NEM 3.0 apply to LADWP or SMUD customers?
No. NEM 3.0 applies only to PG&E, SCE, and SDG&E. LADWP, SMUD, and other municipal utilities set their own solar billing rules.
Can I add a battery to my NEM 2.0 system?
Generally, yes, without losing your legacy terms, but follow your utility’s current interconnection and expansion rules. Larger system expansions can move you onto NEM 3.0.
Does the California fixed charge apply to solar customers?
Yes. The Base Services Charge is $24.15 per month for most customers, $12.08 for FERA and $6.00 for CARE, and solar cannot remove it. It started at SDG&E in October 2025, SCE in November 2025, and PG&E in March 2026.
Is solar still worth it under NEM 3.0?
For many homes, it can be, especially when the system is sized for self-use and paired with a battery. The answer depends on your usage, your rate plan, and your cost, so a free estimate with your own bills is the best way to know.